top of page

Water Valve Replacement

Water shutoff valves are being replaced at a number of buildings in the Noble Firs Complex. The valves are on order and are expected to arrive at the end of the week. The plumber will be installing them next week. It will take approximately 3 to 4 days. To install the valves the water will have to be turned off from around 9:00am to 4:00pm each day. An email will be sent out as soon as the exact dates and times are known. Notices will be posted at homeowners doors.

Tags:

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page